- Setting steel for the roof slab of the Box Culvert.
- Installation of electrical conduit in the West parkway of Orchard.
- Topsoil excavation and earthwork for roadway widening of the new northbound lanes North of the Box Culvert.
Work for the Week of 4/16/12
This entry was posted in Uncategorized. Bookmark the permalink.
